Under ASC 350-40 a SaaS company capitalizes platform build costs once a project is funded and probable to complete. ASU 2025-06 changes when that is.

By The LedgerIt team7 min read

A SaaS company capitalizes software development costs under ASC 350-40, the internal-use software rules: the payroll and outside fees spent coding and testing its platform become an asset on the balance sheet, amortized after launch, instead of an expense when paid. Everything before the project qualifies, and everything after launch except new functionality, is expensed.

When a project qualifies is changing. ASU 2025-06, issued by the FASB in September 2025, replaces the old project stages with a "probable-to-complete" test, effective for annual periods beginning after December 15, 2027. This guide covers both rules, what can be capitalized, a worked build under each, and what it means for a startup's books.

Which rules apply to software a SaaS company builds

Software a SaaS company builds and runs for customers, rather than selling as a downloadable license, falls under ASC 350-40, Intangibles: Internal-Use Software. Software sold as an on-premises license follows Subtopic 985-20 instead. The two have historically produced different amounts of capitalization for similar work.

The FASB says as much in ASU 2025-06. It expects the new rules to leave capitalization largely unchanged for most software, but for software "to be provided via a cloud computing arrangement" it expects capitalization to decrease, which better aligns SaaS with on-premises software under Subtopic 985-20.

The same subtopic also covers implementation costs of cloud software you buy, such as configuring an ERP system you subscribe to. This guide is about the platform you build.

When capitalization starts today: the project stages

Under the guidance in effect until ASU 2025-06 applies, a software project moves through three stages. Costs in the preliminary project stage, deciding what to build and evaluating alternatives, are expensed. Costs in the application development stage, coding, installation and testing, are capitalized. Costs after the software is ready for use are expensed.

The stages are set out in Section 350-40-25, and ASU 2025-06 removes every reference to them. Capitalization begins once the preliminary stage is complete and management authorizes and commits to funding the project, and it stops no later than when the software is substantially complete and ready for its intended use, "after all substantial testing is completed" (350-40-25-14).

Stakeholders told the FASB the stages were hard to apply to iterative development, where a team designs, codes and tests in two-week cycles rather than in one long sequence. That is the problem the update fixes.

How ASU 2025-06 changes when capitalization starts

ASU 2025-06 removes the project stages. Capitalization starts when management has authorized and committed to funding the project and it is probable the project will be completed and the software used as intended. Significant development uncertainty, such as an unproven novel feature, blocks that threshold until coding and testing resolve it.

The update gives two factors for significant development uncertainty:

  • Novelty. The software has technological innovations or novel, unique or unproven functions or features, and that uncertainty has not yet been resolved through coding and testing.
  • Unsettled requirements. The company has not determined what it needs the software to do, or is still substantially revising its significant performance requirements.

It is effective for all entities for annual reporting periods beginning after December 15, 2027, so 2028 for a calendar-year company. Early adoption is permitted as of the beginning of an annual reporting period, and a company can transition prospectively, with a modified approach, or retrospectively.

Which software costs can be capitalized

Only direct costs of building the software qualify: outside fees for developing it, payroll and benefits for employees to the extent of time spent directly on the project, interest under Subtopic 835-20, and software to convert old data. Training, data conversion work, maintenance, and general and administrative or overhead costs are expensed, whichever rule applies.

CostTreatment
Fees paid to contractors to build or test the softwareCapitalize
Payroll and benefits of engineers, for time spent directly on the projectCapitalize
Software that lets new systems access or convert old dataCapitalize
Interest while developing, under Subtopic 835-20Capitalize
Training employees or customersExpense
Data conversion work: cleansing, reconciling, migrating dataExpense
Maintenance and bug fixes after launchExpense
General and administrative costs and overheadExpense
Upgrades that add functionality the software could not perform beforeCapitalize, under the same start and stop rules

The payroll line is where the work is. It needs a record of who worked on which project, and when, that an auditor can test. A common approach is engineering tickets or a monthly time allocation per engineer, approved by an engineering lead.

A worked example: one build under both rules

A SaaS company spends January to June 2026 building a usage-based billing module. Four engineers cost $60,000 a month in payroll and benefits, and a contractor bills $12,000 for security testing in May and June. Under the current stages it capitalizes $252,000. Under ASU 2025-06 it would capitalize $132,000 of the same $372,000.

The facts:

  • January and February: the team evaluates build or buy and prototypes the design. The project is approved and funded on March 1.
  • The module's metering engine is novel for the company, and its approach is only proven in testing at the end of April.
  • The module launches on July 1, 2026. The company amortizes it over three years from launch.
MonthCostCurrent stagesASU 2025-06
January to February$120,000Expensed (preliminary stage)Expensed (not authorized)
March to April$120,000CapitalizedExpensed (development uncertainty)
May to June$120,000CapitalizedCapitalized
Contractor, May to June$12,000CapitalizedCapitalized
Capitalized$252,000$132,000
Expensed$120,000$240,000
Amortization, July to December 2026$42,000$22,000

Amortization of $252,000 over 36 months is $7,000 a month, or $42,000 for July to December. The same build under ASU 2025-06 is $3,666.67 a month and $22,000 for the six months.

Training the support team on the new module and migrating old invoices into it are expensed under both rules.

What capitalizing does to your financial statements

Capitalizing moves development cost from operating expenses into an asset and spreads it over the software's life as amortization. Operating loss looks smaller in the build year and larger in later years. Cash is identical either way, which is why investors look past it.

In the statement of cash flows, capitalized software development is an investing outflow rather than an operating one. Net burn still counts it: an investor computing burn adds operating and investing cash together, so capitalizing never improves a burn multiple.

ASU 2025-06 also says the property, plant and equipment disclosures in Subtopic 360-10 apply to all capitalized internal-use software, however it is presented. Expect your auditor to ask for a roll-forward: opening balance, additions, amortization, impairments and closing balance.

Tax is a separate question. The deduction for the same engineering costs follows IRC §174A, not your GAAP policy, and the section 174 changes explain how research costs are deducted for tax now.

Should a seed-stage startup capitalize at all

ASC 350-40 applies to any company reporting under US GAAP, but a seed company's policy usually gets tested only at its first audit. Setting it up then is harder than tracking engineering time from the first funded project. Decide with whoever will audit you.

Two practical points push the decision earlier:

  • The records have to exist. Capitalized payroll needs time by project, kept as the work happens. Reconstructing two years of engineering time for an auditor rarely holds up.
  • The rule change is close. A company setting a policy now can adopt ASU 2025-06 early, at the beginning of an annual period, and skip the project stages entirely.

What to do this month

The work is a written policy, a project list and engineering time by project. With those three, the monthly entry is a reclassification from payroll expense to the software asset, and the year-end roll-forward comes straight out of the books.

  1. Write a capitalization policy: the rule you follow, current stages or ASU 2025-06 if adopted early, the amortization period and a minimum project size.
  2. List active engineering projects with the date each was authorized and funded.
  3. Record engineering time by project each month, approved by an engineering lead.
  4. Capitalize qualifying payroll and contractor costs monthly, and expense training, data conversion and maintenance.
  5. Start amortization in the month each project is ready for its intended use.
  6. Keep a roll-forward of the software asset for the audit.

LedgerIt keeps engineering payroll and contractor spend in your books every month, which is where a capitalization entry and its roll-forward start.

Books you don't have to check.

LedgerIt closes your books by the 5th, keeps your ARR and runway honest, and has your data room ready when investors ask.

Book a demo